Data Centers in Wyoming

Wyoming has 6 tracked data centers representing roughly 908 MW of capacity, operated by 4 companies.

State
Wyoming
Facilities
6
Tracked capacity
908 MW
Operators
Microsoft, Google, Green House Data, Meta

Facilities

FacilityOperatorLocationStatusCapacity
Azure Cheyenne CampusMicrosoftCheyenne, WYUnder construction200 MW
Google Cheyenne WYGoogleCheyenne, WYPlanned100 MW
Green House Data CheyenneGreen House DataCheyenne, WYOperational8 MW
Microsoft CheyenneMicrosoftCheyenne, WYOperational150 MW
Microsoft Cheyenne 2MicrosoftCheyenne, WYUnder construction200 MW
Meta Cheyenne WYMetaCheyenne, WYUnder construction250 MW

Cities in this state

Operators in this state

Wyoming: incentives, local rules, electricity and water

A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.

Local moratoriums and zoning

A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.

Electricity and household bills

State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.

Water and cooling

Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.

Wyoming legislation and reported bill statuses

EIA electricity data ยท EPA commercial-building water guidance