NVIDIA Guarantees 4.25 GW at SB Energy's PORTS-Pike Campus in Ohio With $105B Backing
OpenAI / SB Energy — NVIDIA Guarantees 4.25 GW at SB Energy's PORTS-Pike Campus in Ohio With $105B Backing. Announced August 2026 in Piketon, OH. Source: Engineering News-Record.
- Operator
- OpenAI / SB Energy
- Location
- Piketon, OH
- Announced
- August 2026
- Source
- Engineering News-Record
Facilities
| Facility | Operator | Location | Status | Capacity |
|---|---|---|---|---|
| PORTS-Pike Technology Campus | OpenAI | Piketon, OH | Under construction | 8000 MW |