Data Centers in Washington
Washington has 34 tracked data centers representing roughly 3,038 MW of capacity, operated by 17 companies.
- State
- Washington
- Facilities
- 34
- Tracked capacity
- 3,038 MW
- Operators
- Microsoft, Vantage Data Centers, TierPoint, Sabey, Google, Yahoo, Equinix, Internap, Digital Realty, EdgeConneX, H5 Data Centers, Prime Data Centers, Digital Fortress, phoenixNAP, Centersquare, Westin Building Exchange, Serverfarm
Facilities
| Facility | Operator | Location | Status | Capacity |
|---|---|---|---|---|
| Azure West US | Microsoft | Quincy, WA | Operational | 200 MW |
| Vantage Quincy | Vantage Data Centers | Quincy, WA | Operational | 60 MW |
| TierPoint Seattle | TierPoint | Seattle, WA | Operational | 25 MW |
| Sabey Quincy WA | Sabey | Quincy, WA | Operational | 60 MW |
| Google Quincy WA | Quincy, WA | Operational | 150 MW | |
| Yahoo Quincy WA | Yahoo | Quincy, WA | Operational | 50 MW |
| Equinix Seattle SE Series | Equinix | Seattle, WA | Operational | 40 MW |
| Internap Seattle | Internap | Seattle, WA | Operational | 15 MW |
| Equinix SE2 | Equinix | Seattle, WA | Operational | 14 MW |
| Equinix SE3 | Equinix | Seattle, WA | Operational | 16 MW |
| Digital Realty Seattle SEA10 | Digital Realty | Tukwila, WA | Operational | 24 MW |
| Digital Realty Seattle SEA11 | Digital Realty | Tukwila, WA | Operational | 36 MW |
| TierPoint Spokane | TierPoint | Spokane, WA | Operational | — |
| Vantage WA1 Quincy | Vantage Data Centers | Quincy, WA | Operational | 100 MW |
| Vantage WA2 Quincy | Vantage Data Centers | Quincy, WA | Under construction | 150 MW |
| EdgeConneX EDC Seattle | EdgeConneX | Seattle, WA | Operational | 22 MW |
| Sabey Quincy SDC1 | Sabey | Quincy, WA | Operational | 60 MW |
| Sabey Quincy SDC2 | Sabey | Quincy, WA | Operational | 90 MW |
| Sabey Quincy SDC3 | Sabey | Quincy, WA | Operational | 120 MW |
| Sabey Quincy SDC4 | Sabey | Quincy, WA | Under construction | 150 MW |
| Sabey Intergate.Seattle | Sabey | Seattle, WA | Operational | 36 MW |
| Sabey Intergate.Tukwila | Sabey | Tukwila, WA | Operational | 24 MW |
| H5 Seattle | H5 Data Centers | Seattle, WA | Operational | 22 MW |
| Prime Yacolt Campus | Prime Data Centers | Quincy, WA | Under construction | 1000 MW |
| Microsoft Quincy 2 | Microsoft | Quincy, WA | Operational | 250 MW |
| Microsoft Quincy 3 | Microsoft | Quincy, WA | Operational | 300 MW |
| Digital Fortress Downtown Seattle | Digital Fortress | Seattle, WA | Operational | 3 MW |
| Digital Fortress Tukwila | Digital Fortress | Tukwila, WA | Operational | 5 MW |
| Digital Fortress Lynnwood | Digital Fortress | Lynnwood, WA | Operational | 2 MW |
| phoenixNAP Seattle | phoenixNAP | Seattle, WA | Operational | 2 MW |
| Centersquare SEA1 Tukwila | Centersquare | Tukwila, WA | Operational | 12 MW |
| Westin Building Exchange | Westin Building Exchange | Seattle, WA | Operational | — |
| H5 Quincy | H5 Data Centers | Quincy, WA | Operational | — |
| Serverfarm TiTAN | Serverfarm | Moses Lake, WA | Operational | — |
Cities in this state
Operators in this state
- Microsoft in Washington
- Vantage Data Centers in Washington
- TierPoint in Washington
- Sabey in Washington
- Google in Washington
- Yahoo in Washington
- Equinix in Washington
- Internap in Washington
- Digital Realty in Washington
- EdgeConneX in Washington
- H5 Data Centers in Washington
- Prime Data Centers in Washington
- Digital Fortress in Washington
- phoenixNAP in Washington
- Centersquare in Washington
- Westin Building Exchange in Washington
- Serverfarm in Washington
Washington: incentives, local rules, electricity and water
A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.
Local moratoriums and zoning
A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.
Electricity and household bills
State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.
Water and cooling
Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.
Washington legislation and reported bill statuses
EIA electricity data · EPA commercial-building water guidance