Data Centers in Tennessee

Tennessee has 18 tracked data centers representing roughly 3,515 MW of capacity, operated by 11 companies.

State
Tennessee
Facilities
18
Tracked capacity
3,515 MW
Operators
Oracle, xAI, Google, Equinix, NTT, Flexential, TierPoint, EdgeConneX, Meta, Expedient, DC BLOX

Facilities

FacilityOperatorLocationStatusCapacity
Oracle Nashville CampusOracleNashville, TNUnder construction150 MW
xAI Colossus MemphisxAIMemphis, TNOperational250 MW
xAI Colossus 2xAIMemphis, TNOperational950 MW
xAI Memphis ExpansionxAIMemphis, TNUnder construction300 MW
Google Clarksville TNGoogleClarksville, TNOperational100 MW
Equinix NashvilleEquinixNashville, TNOperational20 MW
NTT NashvilleNTTNashville, TNOperational15 MW
xAI Memphis Building 4xAIMemphis, TNUnder construction—
Flexential NashvilleFlexentialNashville, TNOperational18 MW
Flexential MemphisFlexentialMemphis, TNOperational14 MW
TierPoint NashvilleTierPointNashville, TNOperational14 MW
EdgeConneX EDC MemphisEdgeConneXMemphis, TNOperational16 MW
EdgeConneX EDC NashvilleEdgeConneXNashville, TNOperational16 MW
Meta Gallatin TNMetaNashville, TNOperational200 MW
xAI Colossus 1 MemphisxAIMemphis, TNOperational250 MW
xAI Colossus 2 MemphisxAIMemphis, TNUnder construction1200 MW
Expedient MemphisExpedientMemphis, TNOperational2 MW
DC BLOX ChattanoogaDC BLOXChattanooga, TNOperational—

Cities in this state

Operators in this state

Tennessee: incentives, local rules, electricity and water

A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.

Local moratoriums and zoning

A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.

Electricity and household bills

State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.

Water and cooling

Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.

Tennessee legislation and reported bill statuses