Data Centers in Oregon
Oregon has 32 tracked data centers representing roughly 2,562 MW of capacity, operated by 15 companies.
- State
- Oregon
- Facilities
- 32
- Tracked capacity
- 2,562 MW
- Operators
- Amazon Web Services, Google, Meta, Flexential, NTT, EdgeConneX, QTS, Digital Realty, Equinix, Stack Infrastructure, Compass Datacenters, Digital Fortress, OneNeck IT Solutions, Pittock Block, T5 Data Centers
Facilities
| Facility | Operator | Location | Status | Capacity |
|---|---|---|---|---|
| US West (Oregon) | Amazon Web Services | The Dalles, OR | Operational | 200 MW |
| Google The Dalles | The Dalles, OR | Operational | 200 MW | |
| Meta Prineville | Meta | Prineville, OR | Operational | 180 MW |
| Flexential Portland | Flexential | Portland, OR | Operational | 30 MW |
| NTT Hillsboro | NTT | Hillsboro, OR | Operational | 40 MW |
| EdgeConneX Portland | EdgeConneX | Portland, OR | Operational | 30 MW |
| QTS Hillsboro Campus | QTS | Hillsboro, OR | Under construction | 150 MW |
| Digital Realty Portland | Digital Realty | Hillsboro, OR | Under construction | 80 MW |
| Meta Prineville Expansion | Meta | Prineville, OR | Under construction | 100 MW |
| AWS Boardman OR | Amazon Web Services | Boardman, OR | Operational | 120 MW |
| Equinix Portland OR | Equinix | Portland, OR | Operational | 25 MW |
| Digital Realty Hillsboro HIL1 | Digital Realty | Hillsboro, OR | Operational | 36 MW |
| Digital Realty Hillsboro HIL2 | Digital Realty | Hillsboro, OR | Operational | 60 MW |
| Digital Realty Hillsboro HIL3 | Digital Realty | Hillsboro, OR | Under construction | 80 MW |
| QTS Eemshaven | QTS | Hillsboro, OR | Under construction | 100 MW |
| Flexential Hillsboro | Flexential | Hillsboro, OR | Operational | 32 MW |
| Flexential Portland-Beaverton | Flexential | Hillsboro, OR | Operational | 22 MW |
| Stack PDX01 | Stack Infrastructure | Hillsboro, OR | Operational | 36 MW |
| Stack PDX02 | Stack Infrastructure | Hillsboro, OR | Operational | 60 MW |
| Stack PDX03 | Stack Infrastructure | Hillsboro, OR | Operational | 90 MW |
| Stack PDX04 | Stack Infrastructure | Hillsboro, OR | Under construction | 120 MW |
| EdgeConneX EDC Portland | EdgeConneX | Portland, OR | Operational | 22 MW |
| NTT Hillsboro HIL1 | NTT | Hillsboro, OR | Operational | 36 MW |
| NTT Hillsboro HIL2 | NTT | Hillsboro, OR | Operational | 60 MW |
| NTT Hillsboro HIL3 | NTT | Hillsboro, OR | Under construction | 100 MW |
| Compass Hillsboro Campus | Compass Datacenters | Hillsboro, OR | Operational | 100 MW |
| Amazon Web Services AWS Boardman Campus | Amazon Web Services | Boardman, OR | Operational | 200 MW |
| Amazon Web Services AWS Umatilla Campus | Amazon Web Services | Umatilla, OR | Operational | 250 MW |
| Digital Fortress Portland | Digital Fortress | Portland, OR | Operational | 2 MW |
| OneNeck Bend | OneNeck IT Solutions | Bend, OR | Operational | 1 MW |
| Pittock Block | Pittock Block | Portland, OR | Operational | — |
| T5 Portland | T5 Data Centers | Hillsboro, OR | Operational | — |
Cities in this state
Operators in this state
- Amazon Web Services in Oregon
- Google in Oregon
- Meta in Oregon
- Flexential in Oregon
- NTT in Oregon
- EdgeConneX in Oregon
- QTS in Oregon
- Digital Realty in Oregon
- Equinix in Oregon
- Stack Infrastructure in Oregon
- Compass Datacenters in Oregon
- Digital Fortress in Oregon
- OneNeck IT Solutions in Oregon
- Pittock Block in Oregon
- T5 Data Centers in Oregon
Oregon: incentives, local rules, electricity and water
A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.
Local moratoriums and zoning
A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.
Electricity and household bills
State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.
Water and cooling
Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.
Oregon legislation and reported bill statuses
EIA electricity data · EPA commercial-building water guidance