Data Centers in Oklahoma

Oklahoma has 5 tracked data centers representing roughly 164 MW of capacity, operated by 4 companies.

State
Oklahoma
Facilities
5
Tracked capacity
164 MW
Operators
Google, TierPoint, EdgeConneX, Lambda

Facilities

FacilityOperatorLocationStatusCapacity
Google Mayes CountyGooglePryor, OKOperational120 MW
TierPoint Oklahoma CityTierPointOklahoma City, OKOperational18 MW
EdgeConneX Oklahoma CityEdgeConneXOklahoma City, OKOperational12 MW
Lambda MidAmerica Data CenterLambdaPryor, OKPlanned—
TierPoint TulsaTierPointTulsa, OKOperational14 MW

Cities in this state

Operators in this state

Oklahoma: incentives, local rules, electricity and water

A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.

Local moratoriums and zoning

A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.

Electricity and household bills

State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.

Water and cooling

Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.

Oklahoma legislation and reported bill statuses

EIA electricity data · EPA commercial-building water guidance