Data Centers in New Hampshire
New Hampshire has 2 tracked data centers representing roughly 9 MW of capacity, operated by 2 companies.
- State
- New Hampshire
- Facilities
- 2
- Tracked capacity
- 9 MW
- Operators
- Sabey, LightEdge
Facilities
| Facility | Operator | Location | Status | Capacity |
|---|---|---|---|---|
| Sabey Meredith NH | Sabey | Meredith, NH | Operational | 5 MW |
| LightEdge Manchester NH | LightEdge | Manchester, NH | Operational | 4 MW |
Cities in this state
Operators in this state
New Hampshire: incentives, local rules, electricity and water
A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.
Local moratoriums and zoning
A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.
Electricity and household bills
State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.
Water and cooling
Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.