Data Centers in North Dakota

North Dakota has 6 tracked data centers representing roughly 930 MW of capacity, operated by 3 companies.

State
North Dakota
Facilities
6
Tracked capacity
930 MW
Operators
Applied Digital, Microsoft, Crusoe Energy

Facilities

FacilityOperatorLocationStatusCapacity
Applied Digital Ellendale NDApplied DigitalEllendale, NDOperational100 MW
Applied Digital Jamestown NDApplied DigitalJamestown, NDOperational100 MW
Azure Fargo NDMicrosoftFargo, NDPlanned100 MW
Crusoe North Dakota PilotCrusoe EnergyBismarck, NDOperational50 MW
Applied Digital Ellendale NDApplied DigitalBismarck, NDUnder construction400 MW
Applied Digital Jamestown NDApplied DigitalFargo, NDOperational180 MW

Cities in this state

Operators in this state

North Dakota: incentives, local rules, electricity and water

A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.

Local moratoriums and zoning

A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.

Electricity and household bills

State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.

Water and cooling

Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.

North Dakota legislation and reported bill statuses

EIA electricity data ยท EPA commercial-building water guidance