Data Centers in North Dakota
North Dakota has 6 tracked data centers representing roughly 930 MW of capacity, operated by 3 companies.
- State
- North Dakota
- Facilities
- 6
- Tracked capacity
- 930 MW
- Operators
- Applied Digital, Microsoft, Crusoe Energy
Facilities
| Facility | Operator | Location | Status | Capacity |
|---|---|---|---|---|
| Applied Digital Ellendale ND | Applied Digital | Ellendale, ND | Operational | 100 MW |
| Applied Digital Jamestown ND | Applied Digital | Jamestown, ND | Operational | 100 MW |
| Azure Fargo ND | Microsoft | Fargo, ND | Planned | 100 MW |
| Crusoe North Dakota Pilot | Crusoe Energy | Bismarck, ND | Operational | 50 MW |
| Applied Digital Ellendale ND | Applied Digital | Bismarck, ND | Under construction | 400 MW |
| Applied Digital Jamestown ND | Applied Digital | Fargo, ND | Operational | 180 MW |
Cities in this state
Operators in this state
North Dakota: incentives, local rules, electricity and water
A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.
Local moratoriums and zoning
A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.
Electricity and household bills
State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.
Water and cooling
Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.
North Dakota legislation and reported bill statuses