Missouri has 17 tracked data centers representing roughly 411 MW of capacity, operated by 14 companies.
- State
- Missouri
- Facilities
- 17
- Tracked capacity
- 411 MW
- Operators
- Google, TierPoint, CoreWeave, Patmos, NTT, Equinix, Amazon Web Services, DataBank, EdgeConneX, LightEdge, Netrality Data Centers, Edged, Bluebird Network, H5 Data Centers
Facilities
| Facility | Operator | Location | Status | Capacity |
|---|---|---|---|---|
| Google Kansas City | Kansas City, MO | Under construction | 200 MW | |
| TierPoint St. Louis | TierPoint | St. Louis, MO | Operational | 20 MW |
| CoreWeave Independence MO | CoreWeave | Independence, MO | Under construction | 80 MW |
| Patmos Kansas City DC | Patmos | Kansas City, MO | Under construction | 30 MW |
| NTT St. Louis | NTT | St. Louis, MO | Operational | 15 MW |
| Equinix St. Louis | Equinix | St. Louis, MO | Operational | 12 MW |
| AWS Montgomery County Campus | Amazon Web Services | Montgomery City, MO | Planned | — |
| DataBank KCY1 | DataBank | Kansas City, MO | Operational | 16 MW |
| TierPoint St. Louis Westport | TierPoint | St. Louis, MO | Operational | 16 MW |
| EdgeConneX EDC Kansas City | EdgeConneX | Kansas City, MO | Operational | 14 MW |
| LightEdge Kansas City | LightEdge | Kansas City, MO | Operational | 2 MW |
| Netrality 1102 Grand | Netrality Data Centers | Kansas City, MO | Operational | 2 MW |
| Netrality 210 North Tucker | Netrality Data Centers | St. Louis, MO | Operational | 2 MW |
| Netrality 900 Walnut | Netrality Data Centers | St. Louis, MO | Operational | 2 MW |
| Edged Kansas City | Edged | Kansas City, MO | Operational | — |
| Bluebird Underground Data Center | Bluebird Network | Springfield, MO | Operational | — |
| H5 St. Louis | H5 Data Centers | St. Louis, MO | Operational | — |
Cities in this state
Operators in this state
- Google in Missouri
- TierPoint in Missouri
- CoreWeave in Missouri
- Patmos in Missouri
- NTT in Missouri
- Equinix in Missouri
- Amazon Web Services in Missouri
- DataBank in Missouri
- EdgeConneX in Missouri
- LightEdge in Missouri
- Netrality Data Centers in Missouri
- Edged in Missouri
- Bluebird Network in Missouri
- H5 Data Centers in Missouri
Missouri: incentives, local rules, electricity and water
A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.
Local moratoriums and zoning
A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.
Electricity and household bills
State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.
Water and cooling
Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.
Missouri legislation and reported bill statuses