Louisiana has 7 tracked data centers representing roughly 7,026 MW of capacity, operated by 4 companies.
- State
- Louisiana
- Facilities
- 7
- Tracked capacity
- 7,026 MW
- Operators
- Meta, Equinix, Data Noc, DartPoints
Facilities
| Facility | Operator | Location | Status | Capacity |
|---|---|---|---|---|
| Meta Hyperion (Richland Parish) | Meta | Richland Parish, LA | Under construction | 5000 MW |
| Equinix New Orleans | Equinix | New Orleans, LA | Operational | 15 MW |
| Data Noc Baton Rouge | Data Noc | Baton Rouge, LA | Operational | 8 MW |
| Meta Richland Parish LA | Meta | Richland Parish, LA | Under construction | 2000 MW |
| DartPoints Baton Rouge 1 | DartPoints | Baton Rouge, LA | Operational | 1 MW |
| DartPoints Baton Rouge 2 | DartPoints | Baton Rouge, LA | Operational | 1 MW |
| DartPoints Shreveport | DartPoints | Shreveport, LA | Operational | 1 MW |
Cities in this state
Operators in this state
Louisiana: incentives, local rules, electricity and water
A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.
Local moratoriums and zoning
A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.
Electricity and household bills
State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.
Water and cooling
Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.