Data Centers in Kentucky

Kentucky has 8 tracked data centers representing roughly 600 MW of capacity, operated by 8 companies.

State
Kentucky
Facilities
8
Tracked capacity
600 MW
Operators
Equinix, QTS, Amazon Web Services, TeraWulf, Meta, Flexential, DartPoints, LightEdge

Facilities

FacilityOperatorLocationStatusCapacity
Equinix LouisvilleEquinixLouisville, KYOperational15 MW
QTS LexingtonQTSLexington, KYOperational20 MW
AWS Kentucky CampusAmazon Web ServicesHebron, KYUnder construction150 MW
TeraWulf Hawesville CampusTeraWulfHawesville, KYUnder construction401 MW
Meta Mason County CampusMetaMaysville, KYPlanned—
Flexential LouisvilleFlexentialLouisville, KYOperational12 MW
DartPoints LouisvilleDartPointsLouisville, KYOperational1 MW
LightEdge LouisvilleLightEdgeLouisville, KYOperational1 MW

Cities in this state

Operators in this state

Kentucky: incentives, local rules, electricity and water

A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.

Local moratoriums and zoning

A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.

Electricity and household bills

State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.

Water and cooling

Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.

Kentucky legislation and reported bill statuses

EIA electricity data · EPA commercial-building water guidance