Data Centers in Kansas

Kansas has 6 tracked data centers representing roughly 389 MW of capacity, operated by 6 companies.

State
Kansas
Facilities
6
Tracked capacity
389 MW
Operators
Google, Meta, QTS, EdgeConneX, Netrality Data Centers, Cavern Technologies

Facilities

FacilityOperatorLocationStatusCapacity
Google Wichita CampusGoogleWichita, KSPlanned200 MW
Meta Lenexa KSMetaLenexa, KSPlanned150 MW
QTS Overland Park KSQTSOverland Park, KSOperational25 MW
EdgeConneX Kansas City KSEdgeConneXKansas City, KSOperational12 MW
Netrality ShawneeNetrality Data CentersShawnee, KSOperational2 MW
Cavern Technologies LenexaCavern TechnologiesLenexa, KSOperational—

Cities in this state

Operators in this state

Kansas: incentives, local rules, electricity and water

A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.

Local moratoriums and zoning

A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.

Electricity and household bills

State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.

Water and cooling

Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.

Kansas legislation and reported bill statuses

EIA electricity data · EPA commercial-building water guidance