Data Centers in Florida

Florida has 25 tracked data centers representing roughly 516 MW of capacity, operated by 15 companies.

State
Florida
Facilities
25
Tracked capacity
516 MW
Operators
Flexential, EdgeConneX, Cologix, Equinix, Digital Realty, CyrusOne, NTT, Microsoft, CoreSite, Hivelocity, Otava, ColoHouse, 365 Data Centers, Centersquare, Colocation America

Facilities

FacilityOperatorLocationStatusCapacity
Flexential TampaFlexentialTampa, FLOperational25 MW
EdgeConneX MiamiEdgeConneXMiami, FLOperational20 MW
Cologix JacksonvilleCologixJacksonville, FLOperational20 MW
Equinix Miami MI SeriesEquinixMiami, FLOperational40 MW
Digital Realty MiamiDigital RealtyMiami, FLOperational30 MW
CyrusOne OrlandoCyrusOneOrlando, FLOperational20 MW
NTT OrlandoNTTOrlando, FLOperational15 MW
Azure Jacksonville FLMicrosoftJacksonville, FLPlanned200 MW
Equinix MI1EquinixMiami, FLOperational10 MW
Equinix MI3EquinixMiami, FLOperational14 MW
CoreSite MI1CoreSiteMiami, FLOperational16 MW
Flexential TampaFlexentialTampa, FLOperational16 MW
Cologix JAX1 JacksonvilleCologixJacksonville, FLOperational14 MW
Cologix JAX2 JacksonvilleCologixJacksonville, FLOperational18 MW
EdgeConneX EDC TampaEdgeConneXTampa, FLOperational16 MW
EdgeConneX EDC MiamiEdgeConneXMiami, FLOperational18 MW
Hivelocity TPA1 TampaHivelocityTampa, FLOperational3 MW
Hivelocity TPA2 TampaHivelocityTampa, FLOperational4 MW
Hivelocity MiamiHivelocityMiami, FLOperational2 MW
Otava MelbourneOtavaMelbourne, FLOperational1 MW
ColoHouse MiamiColoHouseMiami, FLOperational2 MW
ColoHouse Fort LauderdaleColoHouseFort Lauderdale, FLOperational1 MW
365 Data Centers Miami365 Data CentersMiami, FLOperational2 MW
Centersquare TPA1 TampaCentersquareTampa, FLOperational9 MW
Colocation America MiamiColocation AmericaMiami, FLOperational—

Cities in this state

Operators in this state

Florida: incentives, local rules, electricity and water

A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.

Local moratoriums and zoning

A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.

Electricity and household bills

State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.

Water and cooling

Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.

Florida legislation and reported bill statuses

EIA electricity data · EPA commercial-building water guidance