Data Centers in District of Columbia

District of Columbia has 3 tracked data centers representing roughly 60 MW of capacity, operated by 3 companies.

State
District of Columbia
Facilities
3
Tracked capacity
60 MW
Operators
Equinix, Digital Realty, Zayo

Facilities

FacilityOperatorLocationStatusCapacity
Equinix DC1-DC6EquinixWashington, DCOperational30 MW
Digital Realty DCA DowntownDigital RealtyWashington, DCOperational20 MW
Zayo DC1ZayoWashington, DCOperational10 MW

Cities in this state

Operators in this state

District of Columbia: incentives, local rules, electricity and water

A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.

Local moratoriums and zoning

A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.

Electricity and household bills

State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.

Water and cooling

Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.

District of Columbia legislation and reported bill statuses

EIA electricity data ยท EPA commercial-building water guidance