Data Centers in Colorado
Colorado has 21 tracked data centers representing roughly 497 MW of capacity, operated by 14 companies.
- State
- Colorado
- Facilities
- 21
- Tracked capacity
- 497 MW
- Operators
- CoreSite, DataBank, Flexential, EdgeConneX, Iron Mountain, Vantage Data Centers, Equinix, Stack Infrastructure, H5 Data Centers, Hivelocity, Novva Data Centers, 365 Data Centers, Centersquare, OneNeck IT Solutions
Facilities
| Facility | Operator | Location | Status | Capacity |
|---|---|---|---|---|
| CoreSite Denver | CoreSite | Denver, CO | Operational | 60 MW |
| DataBank Denver | DataBank | Denver, CO | Operational | 35 MW |
| Flexential Denver | Flexential | Denver, CO | Operational | 40 MW |
| EdgeConneX Denver | EdgeConneX | Denver, CO | Operational | 25 MW |
| Iron Mountain Denver | Iron Mountain | Denver, CO | Operational | 35 MW |
| Vantage Denver Campus | Vantage Data Centers | Denver, CO | Under construction | 80 MW |
| Equinix Denver DE Series | Equinix | Denver, CO | Operational | 30 MW |
| Stack Denver | Stack Infrastructure | Denver, CO | Operational | 25 MW |
| Equinix DE1 | Equinix | Denver, CO | Operational | 10 MW |
| Equinix DE2 | Equinix | Denver, CO | Operational | 14 MW |
| CoreSite DE1 | CoreSite | Denver, CO | Operational | 18 MW |
| CoreSite DE2 | CoreSite | Denver, CO | Operational | 24 MW |
| Flexential Denver-Englewood | Flexential | Englewood, CO | Operational | 18 MW |
| H5 Denver | H5 Data Centers | Denver, CO | Operational | 24 MW |
| Hivelocity COS1 Colorado Springs | Hivelocity | Colorado Springs, CO | Operational | 1 MW |
| Novva Colorado Springs | Novva Data Centers | Colorado Springs, CO | Under construction | 20 MW |
| 365 Data Centers Denver | 365 Data Centers | Denver, CO | Operational | 2 MW |
| Centersquare DEN1 Highlands Ranch | Centersquare | Highlands Ranch, CO | Operational | 18 MW |
| Centersquare DEN2 Englewood | Centersquare | Englewood, CO | Operational | 12 MW |
| OneNeck Denver Englewood | OneNeck IT Solutions | Englewood, CO | Operational | 3 MW |
| OneNeck Parker | OneNeck IT Solutions | Parker, CO | Under construction | 3 MW |
Cities in this state
Operators in this state
- CoreSite in Colorado
- DataBank in Colorado
- Flexential in Colorado
- EdgeConneX in Colorado
- Iron Mountain in Colorado
- Vantage Data Centers in Colorado
- Equinix in Colorado
- Stack Infrastructure in Colorado
- H5 Data Centers in Colorado
- Hivelocity in Colorado
- Novva Data Centers in Colorado
- 365 Data Centers in Colorado
- Centersquare in Colorado
- OneNeck IT Solutions in Colorado
Colorado: incentives, local rules, electricity and water
A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.
Local moratoriums and zoning
A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.
Electricity and household bills
State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.
Water and cooling
Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.