Data Centers in Alabama

Alabama has 5 tracked data centers representing roughly 350 MW of capacity, operated by 3 companies.

State
Alabama
Facilities
5
Tracked capacity
350 MW
Operators
Google, Meta, DC BLOX

Facilities

FacilityOperatorLocationStatusCapacity
Google Bridgeport ALGoogleBridgeport, ALOperational80 MW
Meta HuntsvilleMetaHuntsville, ALOperational120 MW
Meta Huntsville ExpansionMetaHuntsville, ALUnder construction150 MW
DC BLOX BirminghamDC BLOXBirmingham, ALOperational—
DC BLOX HuntsvilleDC BLOXHuntsville, ALOperational—

Cities in this state

Operators in this state

Alabama: incentives, local rules, electricity and water

A current state-specific incentive summary has not been independently verified for this section. This does not mean no incentive exists.

Local moratoriums and zoning

A statewide bill is not evidence of a local moratorium. Current restrictions require a dated city or county ordinance. This section does not establish whether a moratorium applies to a particular property.

Electricity and household bills

State electricity averages do not establish a project's tariff or its effect on household bills. Project-specific conclusions require utility filings and regulator decisions. A current facility-specific bill impact is not established here.

Water and cooling

Water demand depends on the cooling system, climate, operating load and water source. A capacity figure alone cannot establish water consumption. Facility-specific withdrawal and discharge figures are unknown unless disclosed in a source.

Alabama legislation and reported bill statuses

EIA electricity data · EPA commercial-building water guidance