Data Centers in Las Vegas Metro
16 tracked data centers and 1,597 MW of capacity across the Las Vegas market. Switch SUPERNAP anchors a low-tax, low-humidity market with growing air-cooled AI builds.
- Tracked facilities
- 16
- Total capacity
- 1,597 MW
- States covered
- Nevada
Facilities
| Facility | Operator | Location | Status | Capacity |
|---|---|---|---|---|
| Switch Las Vegas SuperNAP | Switch | Las Vegas, NV | Operational | 250 MW |
| Switch CITADEL Campus | Switch | Las Vegas, NV | Under construction | 200 MW |
| Google Henderson NV | Henderson, NV | Operational | 100 MW | |
| Equinix Las Vegas LV1 | Equinix | Las Vegas, NV | Operational | 20 MW |
| Flexential Las Vegas | Flexential | Las Vegas, NV | Operational | 15 MW |
| Flexential Las Vegas-Lone Mountain | Flexential | Las Vegas, NV | Operational | 16 MW |
| DataBank LAS1 | DataBank | Las Vegas, NV | Operational | 20 MW |
| TierPoint Las Vegas | TierPoint | Las Vegas, NV | Operational | 18 MW |
| Switch LAS VEGAS Core | Switch | Las Vegas, NV | Operational | 100 MW |
| Switch LAS VEGAS 9 | Switch | Las Vegas, NV | Operational | 150 MW |
| Switch LAS VEGAS 10 | Switch | Las Vegas, NV | Operational | 200 MW |
| Switch LAS VEGAS 11 | Switch | Las Vegas, NV | Under construction | 250 MW |
| EdgeConneX EDC Las Vegas | EdgeConneX | Las Vegas, NV | Operational | 18 MW |
| Google Henderson | Henderson, NV | Operational | 150 MW | |
| CoreWeave Las Vegas | CoreWeave | Las Vegas, NV | Operational | 80 MW |
| Novva Las Vegas | Novva Data Centers | Las Vegas, NV | Operational | 10 MW |