IREN Sweetwater Hub — Sweetwater, Texas

IREN Sweetwater Hub is a hyperscale data center operated by IREN in Sweetwater, Texas. The facility is under construction with approximately 2000 MW of IT capacity, with completion expected in 2029. Two-project, 2 GW West Texas hub conditionally classified as Base Load in ERCOT's Batch Zero interconnection process, September 2026.

Operator
IREN
Location
Sweetwater, Texas
County
Sweetwater County
Status
Under construction
Type
hyperscale
Capacity
2000 MW
Expected completion
2029