Data Centers in Las Vegas, Nevada

Las Vegas, Nevada has 23 tracked data centers in Clark, representing roughly 2,199 MW of capacity. 20 operational, 3 under construction and 0 planned.

City
Las Vegas, Nevada
County
Clark
Total facilities
23
Operational
20
Under construction
3
Planned
0
Tracked capacity
2,199 MW
Operators
CoreWeave, DataBank, EdgeConneX, Equinix, Flexential, Novva Data Centers, Switch, TierPoint

Facilities

FacilityOperatorLocationStatusCapacity
Switch Las Vegas SuperNAPSwitchLas Vegas, NVOperational250 MW
Switch LAS VEGAS 11SwitchLas Vegas, NVUnder construction250 MW
Switch LAS VEGAS 11SwitchLas Vegas, NVUnder construction250 MW
Switch CITADEL CampusSwitchLas Vegas, NVUnder construction200 MW
Switch LAS VEGAS 10SwitchLas Vegas, NVOperational200 MW
Switch LAS VEGAS 10SwitchLas Vegas, NVOperational200 MW
Switch LAS VEGAS 9SwitchLas Vegas, NVOperational150 MW
Switch LAS VEGAS 9SwitchLas Vegas, NVOperational150 MW
Switch LAS VEGAS CoreSwitchLas Vegas, NVOperational100 MW
Switch LAS VEGAS CoreSwitchLas Vegas, NVOperational100 MW
CoreWeave Las VegasCoreWeaveLas Vegas, NVOperational80 MW
CoreWeave Las VegasCoreWeaveLas Vegas, NVOperational80 MW
DataBank LAS1DataBankLas Vegas, NVOperational20 MW
DataBank LAS1DataBankLas Vegas, NVOperational20 MW
Equinix Las Vegas LV1EquinixLas Vegas, NVOperational20 MW
EdgeConneX EDC Las VegasEdgeConneXLas Vegas, NVOperational18 MW
EdgeConneX EDC Las VegasEdgeConneXLas Vegas, NVOperational18 MW
TierPoint Las VegasTierPointLas Vegas, NVOperational18 MW
TierPoint Las VegasTierPointLas Vegas, NVOperational18 MW
Flexential Las Vegas-Lone MountainFlexentialLas Vegas, NVOperational16 MW
Flexential Las Vegas-Lone MountainFlexentialLas Vegas, NVOperational16 MW
Flexential Las VegasFlexentialLas Vegas, NVOperational15 MW
Novva Las VegasNovva Data CentersLas Vegas, NVOperational10 MW