Data Centers in Grand Rapids, Michigan
Grand Rapids, Michigan has 8 tracked data centers in Kent, representing roughly 432 MW of capacity. 8 operational, 0 under construction and 0 planned.
- City
- Grand Rapids, Michigan
- County
- Kent
- Total facilities
- 8
- Operational
- 8
- Under construction
- 0
- Planned
- 0
- Tracked capacity
- 432 MW
- Operators
- DataBank, Otava, Switch, US Signal
Facilities
| Facility | Operator | Location | Status | Capacity |
|---|---|---|---|---|
| Switch Grand Rapids | Switch | Grand Rapids, MI | Operational | 100 MW |
| Switch PYRAMID 2 | Switch | Grand Rapids, MI | Operational | 100 MW |
| Switch PYRAMID 2 | Switch | Grand Rapids, MI | Operational | 100 MW |
| Switch PYRAMID Grand Rapids | Switch | Grand Rapids, MI | Operational | 60 MW |
| Switch PYRAMID Grand Rapids | Switch | Grand Rapids, MI | Operational | 60 MW |
| DataBank Grand Rapids | DataBank | Grand Rapids, MI | Operational | 10 MW |
| Otava Grand Rapids | Otava | Grand Rapids, MI | Operational | 1 MW |
| US Signal Grand Rapids Downtown | US Signal | Grand Rapids, MI | Operational | 1 MW |