Data Centers in Altoona, Iowa
Altoona, Iowa has 6 tracked data centers in Polk, representing roughly 856 MW of capacity. 5 operational, 1 under construction and 0 planned.
- City
- Altoona, Iowa
- County
- Polk
- Total facilities
- 6
- Operational
- 5
- Under construction
- 1
- Planned
- 0
- Tracked capacity
- 856 MW
- Operators
- LightEdge, Meta, Microsoft
Facilities
| Facility | Operator | Location | Status | Capacity |
|---|---|---|---|---|
| Microsoft Des Moines 2 | Microsoft | Altoona, IA | Operational | 250 MW |
| Microsoft Des Moines 2 | Microsoft | Altoona, IA | Operational | 250 MW |
| Meta Altoona | Meta | Altoona, IA | Operational | 200 MW |
| Meta Altoona Expansion | Meta | Altoona, IA | Under construction | 150 MW |
| LightEdge DSM1 Des Moines | LightEdge | Altoona, IA | Operational | 3 MW |
| LightEdge DSM2 Des Moines | LightEdge | Altoona, IA | Operational | 3 MW |